Non-Ferrous Round Bar Mini-Plant

Turnkey non-ferrous round bar production mini-plant

  • Modern Technologies Modern Technologies is an engineering company specializing in developing and deploying modern industrial solutions in metallurgy and non-ferrous metal processing. The company offers the design, supply, and start-up of turnkey non-ferrous round bar production mini-plants, delivering the full process cycle - from feedstock to finished product. Our engineering solutions are focused on building compact, energy-efficient, high-tech production complexes for round bar in aluminum, copper, brass, bronze, and other non-ferrous metals.

The mini-plant is designed for: Producing round bar from non-ferrous metals, used across various industries. Main products:

  • Aluminum round bar.
  • Copper round bar.
  • Brass round bar.
  • Bronze round bar.
  • Round bar in non-ferrous alloys.
  • Billets for machining. The product is used in:
  • Machine building.
  • Power engineering.
  • The aviation industry.
  • Construction.
  • Electrical engineering.
  • Shipbuilding.
  • Producing parts and components. The mini-plant delivers stable production of high-quality bar with precise geometric parameters.

The production process includes:

  • Receiving and preparing the feedstock
  • Melting the non-ferrous metal
  • Melt cleaning
  • Billet casting
  • Billet heating
  • Round bar rolling
  • Cooling
  • Cutting
  • Packaging

The technology delivers round bar with high precision and a uniform metal structure.

Main equipment Feedstock preparation section

  • Non-ferrous metal warehouse.
  • Sorting equipment.
  • Loading systems.
  • Transport mechanisms.
  • Storage systems. Purpose - preparing aluminum, copper, and alloys for melting .

Melting complex Includes:

  • Induction furnaces.
  • Crucible furnaces.
  • Melting units.
  • Temperature control system.
  • Slag removal system. Main parameters:
  • Aluminum melting temperature: 700⁠-⁠800°C.
  • Copper melting temperature: 1100⁠-⁠1200°C.
  • Bronze melting temperature: 1000⁠-⁠1100°C.
  • Furnace capacity: 500 kg - 5 tonnes. The melting complex delivers high-quality melt.

Melt cleaning system Used for:

  • Removing slag.
  • Degassing.
  • Filtration.
  • Stabilizing composition. Equipment:
  • Filters.
  • Degassers.
  • Flux systems. This ensures high metal quality.

Casting section Includes:

  • Continuous casting machine.
  • Horizontal casting.
  • Semi-continuous casting.
  • Molds.
  • Cooling. The billet produced:
  • Round.
  • Square.
  • Ingot.

Heating furnace Used to prepare the billet for rolling. Types:

  • Gas furnace.
  • Electric furnace.
  • Induction furnace Heating temperature: :
  • Aluminum: 450⁠-⁠500°C.
  • Copper: 700⁠-⁠800°C.
  • Brass: 600⁠-⁠700°C. Rolling mill Includes:
  • Rolling stands.
  • Roller tables.
  • Gearboxes.
  • Shears.
  • Cooling bed.
  • Cutting system. Purpose - forming round bar of the required diameter.

Cooling and cutting line

  • Cooling bed.
  • Saws.
  • Shears.
  • Conveyor.
  • Packaging. Product length: 3⁠-⁠6 meters 6⁠-⁠12 meters.

Production capacity Small plant:

  • 500⁠-⁠1,500 tonnes a month.
  • Compact line.
  • Minimal investment. Medium plant:
  • 2,000⁠-⁠4,000 tonnes a month.
  • Automated production. Large mini-plant:
  • Up to 6,000 tonnes a month.
  • Industrial scale.

Product range Round bar diameter:

  • 10⁠-⁠30 mm.
  • 30⁠-⁠60 mm.
  • 60⁠-⁠120 mm. Metals:
  • Aluminum.
  • Copper.
  • Brass.
  • Bronze.
  • Non-ferrous alloys. Power consumption Per tonne of product:
  • Electricity: 300⁠-⁠500 kW.
  • Water: 2⁠-⁠4 m³.
  • Gas: as needed.
  • Metal: 1.03 t. The water recirculation system ensures environmental safety.

Advantages of Modern Technologies solutions

  • A full-cycle engineering company
  • Turnkey design
  • Modern technology
  • Compact lines
  • Energy efficiency
  • High output
  • Process automation
  • Custom solutions
  • Technical support
  • Staff training
  • Production start-up

Project delivery timeline

  • Design: 2⁠-⁠3 months

  • Equipment manufacturing: 4⁠-⁠6 months

  • Installation: 3 months

  • Commissioning: 1 month Total delivery time: 8⁠-⁠12 months

  • Modern Technologies We build modern metallurgical complexes and engineering solutions for non-ferrous metal processing and industrial production. Modern Technologies - engineering, technology, and industrial development.

Get a quote

Send us a drawing or a photo of the part. We will work out the process, the plant configuration and the price.

Get a quote WhatsApp