GAS-LIV Gas Distribution Systems

Advantages over competing systems

Energy efficiency;15⁠-⁠20% lower gas losses through precise regulation Maintainability;Fast module replacement without stopping the system (hot-swap) Service life;25+ years thanks to wear-resistant components. Certification;Compliant with GOST R 54983⁠-⁠2012, TR CU 012/2011 (EAEU), ATEX (for explosion-proof versions).

Configuration options

OptionBase versionExtended version
Remote monitoring-Yes (4G/Ethernet)
Explosion protection (Ex d/e)-Yes
Backup regulator-Yes
Gas heating system-Yes (for low temperatures)

Deployment examples:

  • Oil refinery (Russia): Installation of 4 GAS-LIV systems for distributing gas between workshops. Result: a 40% reduction in emergency shutdowns
  • Utility services (Kazakhstan): Automation of gas distribution stations in 15 towns. Payback period - 2.3 years Additional services:
  • Supervised installation and commissioning.
  • Staff training (online/offline).
  • Development of custom solutions (for non-standard parameters).

Key users in Kazakhstan

Main suppliers and prices

Price comparison of key components

ComponentSchlumbergerBaker HughesGazpromneftChinese equivalent
Control unit8⁠-⁠12 million KZT7⁠-⁠10 million KZT5⁠-⁠8 million KZT3⁠-⁠6 million KZT
Gas lift valves (per pc.)1.5⁠-⁠2.5 million KZT1.2⁠-⁠2 million KZT0.8⁠-⁠1.5 million KZT0.5⁠-⁠1 million KZT
SCADA module5⁠-⁠8 million KZT4⁠-⁠7 million KZT3⁠-⁠5 million KZT2⁠-⁠4 million KZT
For large fieldsFor mid-size projectsBudget solutions:
Schlumberger via “OilService Group”Gazpromneft-TsR via “PromNefteGaz”Chinese equivalents via “Asia TechOil”
Full cycle from design to serviceA ready-to-run system for 12⁠-⁠18 million KZTBase configuration from 4 million KZT

Turnkey price: 25⁠-⁠35 million KZT per installation;

Market trends:

  • Rising demand: +20% in 2024
  • Localization: Assembly in Atyrau (joint venture with Baker Hughes)
  • Digitalization: Deploying AI to forecast operating modes How to order:
  • For state-owned companies: Through KazMunayGas tenders. GOST K certification required
  • For private operators: Direct purchases from suppliers. Leasing available through DBK

Get a quote

Send us a drawing or a photo of the part. We will work out the process, the plant configuration and the price.

Get a quote WhatsApp